Hazardous-material remediation, strip-out and building refurbishment from a single provider

Nordrhein-Westfalen +49 174 7111166

L-01 · Investigate safely, remediate methodically

Hazardous-material remediation

Affected areas are handled under controlled conditions so the building is safely prepared for strip-out, modernisation or further construction work.

Hazardous substances in buildings can put residents, employees and operatives at risk. In older buildings, industrial premises and other existing property, contamination is often exposed only during alteration or dismantling.

The remediation method depends on the substance, its condition and location, and the extent of contamination. If no investigation exists, sampling and analysis by a suitable laboratory or specialist may be necessary.

Segregated work zone with technical dust control in an existing building
Representative image · see image credits

Scope of work

Hazardous-material remediation

  • Asbestos-containing building materials
  • Man-made mineral fibres and older mineral wool
  • Materials containing PCB
  • Building materials and adhesives containing PAH
  • Contaminated floor and wall layers
  • Contaminated insulation
  • Contaminated building elements and technical areas
  • Other dangerous or harmful substances identified in the building

Working sequence

Project-specific method

The type and extent of the work are set only after the findings and available documents have been reviewed. Protected zones, access control and technical measures are planned for the building.

  1. 01

    Survey the existing condition and affected areas

  2. 02

    Review expert reports, laboratory results and building records

  3. 03

    Plan work and protection zones and segregate them where required

  4. 04

    Install technical protection measures

  5. 05

    Remove affected materials safely

  6. 06

    Package, label and prepare materials for transport

  7. 07

    Clean the work areas

  8. 08

    Coordinate independent clearance where required

Coordination and conditions

Required notifications, checks, measurements and disposal records are considered according to the project and applicable law or coordinated with suitable specialists.

Hazardous-material remediation, strip-out and building refurbishment can be planned as one coordinated sequence.

Quote

Talk to us about your project

Request a site visit or quote. The site address, description of the work and available records help with the first review.