L-04 · Preparing existing buildings for what comes next
Building refurbishment
Existing buildings gain a dependable starting point for modernisation, a new use or the next construction phase.
Wear, moisture, outdated materials, new use plans or identified hazardous substances can make substantial work to existing buildings necessary.
Hazardous-material remediation, strip-out and building refurbishment can be combined in a coordinated sequence where required.
Scope of work
Refurbishment
- Prepare buildings for alteration and modernisation
- Remove damaged or affected building materials
- Remove redundant fittings
- Remediate and prepare affected building areas
- Expose walls, ceilings and floors
- Carry out enabling work for subsequent trades
- Coordinate dismantling and remediation phases
- Clear the area, separate materials and hand it over broom-clean
Working sequence
Project-specific method
The scope boundaries and handover condition are defined with the subsequent trades. This avoids duplicated work and unclear interfaces.
- 01
Clarify the existing condition and refurbishment objective
- 02
Review findings and records
- 03
Coordinate dismantling and protection measures
- 04
Remove affected or damaged layers
- 05
Prepare surfaces and connections for subsequent trades
- 06
Document the broom-clean condition and hand over the area
Coordination and conditions
Coordinate remediation, strip-out and controlled dismantling
Define clear interfaces to fit-out, building-services and construction trades